The Whitcomb Locomotives Ne 120 and the Military Railway Service

The Whitcomb Locomotives Ne 120 and the Military Railway Service

by Andrea Gatti, Gothic Tuscany npa

According to the classification of the “Ferrovie dello Stato Italiane” the Italian railway holding, the locomotive pictured below is a D143.

The D143s are diesel-electric hauling locomotives; they are the mechanical and electrical update of the Ne 120 series. This locomotive was built in 1943 and registered in 1944 by the Military Railway Service as serial number 1248.

During the 1948 it started the service in the Ferrovie dello Stato Italiane as 1200.026. The identification changed during 1953 to 120.026. The serial number D143-3021 arrived in 1971, following the complete revamping of the vehicle.
Actually, only few of such locomotives survived:

the D143-3021 (MRS 1248) and the D143-3019 (MSR1243) are in the historical vehicles fleet of the Fondazione Ferrovie Dello Stato while the D143-3045 (MRS 1242) is classified “Heritage item” by the “Regione Sicilia”.

The Ne 120s were built by the Whitcomb Locomotive Works from 1941 and 1944. The engine was a Lenova licensed Buda, the electrical equipment was made by Westighouse.

Several series was built and used in North Africa and Middle East; they arrived in Italy during 1944 with the Military Railway Service.

D143_3021

D143 3021 Photo by Ale316 of Wikipedia in Italian. With license CC BY-SA 3.0 from Wikimedia Commons

whitcomb-09_NE1308-Cassino

The Ne 120-1308 coupled to an unknown Ne 120 at Cassino – The original caption say: A coal train pulled in Cassino, Italy, on the first Naples-Rome service after the Allied occupation (7-20-44)

Locomotive FS Ne 1200-024 of the italian

FS Locomotives Ne 1200-024 of the Italian “Ferrovie dello Stato” in 1953

Military Railway Service

Extract from “On Point” Fall 2013 – Railroaders in Olive Drab
by Lieutenant Colonel Clayton R. Newell, USA-Ret [1].

During World War II, the MRS operated in every theater of operation where American forces were present. At its peak, it included eleven grand divisions, thirty-three railway operating battalions, and eleven railway shop battalions. A variety of engineer, signal, and military police units provided support to the railroaders.

After freeing North Africa from Axis occupation, the Allies' next move was to Sicily, and MRS personnel went with them.
Three days after the initial landings on 10 July 1943, the 727th Railway Operating Battalion went ashore at Licata, Sicily, and immediately began work on the Sicilian railway. Lieutenant General George S. Patton, Jr., later wrote that the battalion “organized national rail workers, located equipment, had steam up, and made a reconnaissance of the rail lines four hours after landing.” In its first twenty-four hours of operations, the 727th moved 400 tons of supplies forward to the 3d Infantry Division. By the third day it was moving 800 tons. During the campaign in Sicily, the 727th operated 1,373 miles of railway using 300 locomotives and 3,500 freight cars that carried an average of 3,400 tons a day to supply Seventh Army.

MRS_in_Italy_800

Soldiers from the 719th Railway Operating Battalion use bulldozers to repair a river crossing destroyed by retreating German troops in Italy, 13 December 1943. (National Archives)

On 9 September 1943, the Allies made their first on the European mainland at Salerno, Italy. After encountering heavy German resistance, they spent the rest of the month building up men and supplies in the beachhead in preparation for an offensive to capture the port city of Naples. Three days after the first Allied troops entered Naples, the advance party of the 703d Railway Grand Division (Atlantic Coast Railroad Company) reached the port only to find that the combination of Allied bombing and German demolition had left the rail yard in shambles. Technical Sergeant Louis L. Russel of the 713th Railway Operating Battalion described the scene on Wednesday 6 October: “Charred and twisted cars were strewn around haphazardly, with lengths of rail cross ties still attached, pointing toward the sky.”

GeneralMarkClark640

An Italian locomotive, nicknamed the “General Mark Clark Special” after Fifth Army commander Lieutenant General
Mark Clark, steams through the rail yards in Naples, 13 November 1943. In addition to using American locomotives
and railcars, MRS units employed salvaged local equipment when possible. (National Archives)

It was a mess, but the next day, First Lieutenant R.H. Anderson, a yardmaster from Newton, Kansas, was optimistic when he said, “I believe we can get a train out of this by Sunday.” With everybody in the battalion, including conductors, engineers, and firemen working to clear the debris, Anderson proved correct. On Saturday, a test train consisting of an old Italian locomotive pushing five cars moved four miles out of the yard. Four days later, six trains moving an average of 450 tons each, rolled to the forward railhead. With the rail yard back in operation, Naples became the primary port for supplying Fifth Army.

Bibliography – Bibliography

  1. On Point Fall 2013 – Railroaders in Olive Drab: The Military Railway Service in World War II by Lieutenant Colonel Clayton R. Newell, USA-Ret.
  2. AMERICAN “RAILS” IN EIGHT COUNTRIES – The Story of the 1st Military Railway Service by: Headquarters, Southern Lines of Communications – European Theater of Operations, US Army – February 1945.
Privacy Preferences

When you visit our website, it may store information through your browser from specific services, usually in the form of cookies. Here you can change your Privacy preferences. It is worth noting that blocking some types of cookies may impact your experience on our website and the services we are able to offer.

Click to enable/disable Google Analytics tracking code.
Click to enable/disable Google Fonts.
Click to enable/disable Google Maps.
Click to enable/disable video embeds.
Our site uses cookies, including third-party cookies. By continuing to browse, you accept cookies.
en_USEN